Ocorreu um erro. Detalhes Ocultar
Você tem páginas não gravadas. Restaurar Cancelar

Open Data Platform, Mexico

This platform is the official Open Data site of Mexico.

Todos os conjuntos de dados:  E F M
  • E
    • setembro 2019
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 16 outubro, 2019
      Selecionar Conjunto de dados
      Displays information on the Distributed Node Prices (PND) of the Day Market in Advance (MDA) and the Real Time Market (MTR) for the National Interconnected Systems (SIN), Baja California (BCA) and Baja California Sur (BCS) .
  • F
    • maio 2019
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 14 junho, 2019
      Selecionar Conjunto de dados
      Foreign Direct Investment (FDI) flows to Mexico, by country of origin, type of investment, economic sector and by state, by economic activity destination. FDI as a percentage of gross fixed capital formation. Unit: USD millions. Frequency: Quarterly. 1999-2018.
  • M
    • maio 2018
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 13 agosto, 2018
      Selecionar Conjunto de dados
      It shows information of the database of gross monthly energy consumption in Mega Watt Hour (MWh) for each of the Control Management of the National Electric System (SEN).
    • abril 2018
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 22 agosto, 2018
      Selecionar Conjunto de dados
    • abril 2018
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 20 agosto, 2018
      Selecionar Conjunto de dados
    • abril 2018
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 21 agosto, 2018
      Selecionar Conjunto de dados
    • abril 2018
      Fonte: Open Data Platform, Mexico
      Carregamento por: Knoema
      Acesso em 19 julho, 2018
      Selecionar Conjunto de dados
      Note:IndicatorDescriptionInjection PointIt is the geographical area where the injection point is located.Extraction PointIt is the geographical area where the extraction point is located.Firm base capacityRate applicable to users who have contracted the service on a firm basis, must be paid according to the maximum daily capacity reserved.Firm base useRate applicable to users who have contracted the service on a firm basis, must be paid according to the energy actually transported.Temporary firm base capacityRate applicable only to users who enter into an investment agreement, in terms of what is established in RES / 262/2004.Temporary firm base useRate applicable only to users who enter into an investment agreement, for the energy effectively transported, in terms of what is established in RES / 262/2004.Interruptible base capacityRate applicable to users who have contracted the service on an interruptible basisInterruptible base useRate applicable to users who have contracted the service on an interruptible basisInterruptible base serviceRate applicable to users who have contracted the service on an interruptible basisVolumetricRate applicable to users who opted to remain in the Transitory Regime and received a volumetric service (RES / 406/2007).

Nossa declaração de privacidade e política de cookies

O nosso website utiliza cookies para facilitar a sua experiência online. Eles foram salvos no seu computador quando você lançou este site. Você pode modificar suas configurações pessoais para cookies através das configurações do seu navegador de Internet.

Política de Privacidade